A demand slide combines six months of actuals with three months of forecast. If both use a single solid line, someone may quote the September estimate as a measured result. Mark the cutoff and make the styles carry meaning.
Split the chart at the last observation
Use solid for the January–June actuals and dashed for the July–September forecast. Label both directly. Mark June as the last actual month, and label September’s 145 as forecast. If you connect the series at June, use the shared point to show continuity without calling June a forecast month.

Illustrated time series. Label the point where observed data ends.
Make the status readable without color
Use line style and text labels as well as color. Keep the axis unit consistent. Include a forecast date or version in the slide note or footer if forecasts can change between meetings.

Illustrated reading check. A viewer can distinguish a measured value from a future estimate.
Export the slide and ask a reader which of June’s 120 and September’s 145 was observed. Check the answer in the source data too. A future-looking line should not fill gaps in the observed series.