The display crew needs about 20 minutes if parts arrive sorted and 35 if they have to sort first. A midpoint of 27.5 minutes is easy to paste into a slide, but it hides the decision the organizer can make.
Show the window on a single axis
Title the chart Estimated display setup time. Use a horizontal scale in minutes and highlight the span from 20 to 35. Label both ends and put the relevant condition underneath. Leave room on the scale outside the highlighted interval so the bar reads as a range.

Illustrated estimate. Put the conditions directly below their endpoints.
Put scheduling guidance in a sentence near the chart: Allow 35 minutes if sorting is still needed. This range comes from two planning assumptions. It gives no probabilities.

Illustrated slide note. Separate the decision from the estimate.
Read back the condition
Ask the organizer what they need to check before reserving the space. In this case, it is whether the parts arrive sorted. If you compare another setup option, use the same minute scale and check that its endpoints match the assumptions written beneath it.



